The setup consists of 65 modules with a total of over 250 meters of track, over 40 switches, and several buildings, signals, etc. 55 of the 65 modules will be exhibitionready by October 1, 2024. Only a 1.2-meter extension of the station, a 1.2-meter extension of the freight ramp, a city module in connection with the station and a side track with 2 station consisting of 7 modules, are not jet reday to be exhibited.
On the setup, there has been placed an incredible amount of emphasis on creating a realistic recreation of nature and other areas on the premises, including through the selection of materials, suppliers, and extensive patination.
The entire modular setup features fully functional signals that are digitally controlled through a computer with a touch screen. There are both double-wing, single-wing, fore, track block, and point signals.