Blog

The complete setup

The setup consists of 65 modules with a total of over 250 meters of track, over 40 switches, and several buildings, signals, etc. 55 of

Læs mere »

The complete setup

Anlægget består 65 moduler med i alt over 250 meter spor, over 40 sporskift, adskillige bygninger, signaler m.m. 55 af de 65 moduler er pr.

Læs mere »

Bundeswehr train transports

German Bundeswehr train transports, or Bundeswehr Rail Transports, are an important part of the supply chain for the German army. These train transporters are used

Læs mere »

Citybahn Passenger Train

The orange German CityBahn trains were introduced in the early 1980s and were part of the German railway system. These trains were developed and manufactured

Læs mere »

90 ton Steamcrane

During World War II, Krupp’s 90-ton steam crane indeed played a significant role in the logistics and construction tasks for the German military. This crane,

Læs mere »

Passengertrains

During World War II, the German railway system was utilized for the transportation of soldiers, weapons, supplies, and civilians across German territory and occupied areas.

Læs mere »

The Armored train P72b

The German armored trains, also known as Panzerspäh-Zug, did play a significant role in Germany’s military strategy on the Eastern Front during World War II.

Læs mere »